NEWS

Completely new conveyor drive station B=1600, E3 was put into operation in MB “Kolubara“ on the open pit mine “Field G” in June 2021. The time availability test (14×24 hour of continuous work) was successfully performed with an achieved availability of 99.95%, without a single failure of electrical equipment. “IT Inženjering” in partnership with “Siemens” […]

Revitalization of belt conveyor drive station with new frequency converters (SINAMICS S120 4x1000kW) was finished in MB “Kolubara” in June This drive station is a part of the ECS-1 (Excavator – Conveyor – Spreader) system 1 in open pit mine „Tamnava West“ “IT Inženjering” Beograd as a subcontractor of “Siemens” Beograd realized next activities: documentation […]

B1600_E2_vest

Completely new conveyor drive station B=1600, E2 was put into operation in MB “Kolubara“ on the open pit mine “Tamnava East” in April 2021. “IT Inženjering” in partnership with “Siemens” Beograd as a subcontractor of company “Energotehnika Južna Bačka” Novi Sad realized next activities: detailed design, documentation for construction, supply and assembling of electrical equipment, […]

In January 2021, completely new mobile shift station MRS1800 was put into operation, in MB “Kolubara” on the open pit mine “Tamnava East”. The time availability test was successfully performed with an achieved availability of 99.1%, without a single failure of electrical equipment. “IT Inženjering“ Beograd, as a subcontractor of  company “Energotehnika – Južna Bačka” […]

IT Engineering Belgrade completed the business year 2020 with a positive financial result and achieved total revenue of 307 million RSD (2.6 million EUR), thus continuing the trend of growth in total revenue and successful business in previous years.

Completely new conveyor drive station B=1600, E1 was put into operation in MB “Kolubara“ on the open pit mine “Tamnava West” in December 2020. “IT Inženjering” in partnership with “Siemens” Beograd as a subcontractor of company “Energotehnika Južna Bačka” Novi Sad realized next activities: detailed design, documentation for construction, supply and assembling of electrical equipment, […]

The company SIEMENS Belgrade, LDA Minerals has declared IT ENGINEERING Belgrade as “Platinum partner” in year 2020

In October 2020, on MB “Tamnava West“, reconstruction of control system of four belt conveyors of the first BTO system was completed. “IT Inženjering” Beograd, in the consortium with company “Energotehnika – Južna Bačka” Novi Sad realized the complete project of reconstruction of electrical equipment.

Over the period of September 2019 to February 2020, “IT Inženjering” Beograd as a subcontractor of the company “ABB Automation Gmbh” Beograd provided technical support in testing and commissioning of the “CQMS” coal quality control system in MB „Kolubara“. “IT Inženjering” Beograd participated in the correction of software for monitoring the quality of coal, as […]