Completely new conveyor drive station B=1600, E3 was put into operation in MB “Kolubara“ on the open pit mine “Field G” in June 2021. The time availability test (14×24 hour of continuous work) was successfully performed with an achieved availability of 99.95%, without a single failure of electrical equipment. “IT Inženjering” in partnership with “Siemens” […]
https://itinzenjering.rs/wp-content/uploads/2021/07/E3-1.jpeg357640adminhttps://itinzenjering.rs/wp-content/uploads/2021/04/it-inzenjering-logo.svgadmin2021-07-12 07:26:322021-07-15 07:39:12For public company “Elektroprivreda Srbije” (EPS) in mining basin „Kolubara“ new conveyor drive station B=1600, E3 (4x400kW) was put into operation
Revitalization of belt conveyor drive station with new frequency converters (SINAMICS S120 4x1000kW) was finished in MB “Kolubara” in June This drive station is a part of the ECS-1 (Excavator – Conveyor – Spreader) system 1 in open pit mine „Tamnava West“ “IT Inženjering” Beograd as a subcontractor of “Siemens” Beograd realized next activities: documentation […]
https://itinzenjering.rs/wp-content/uploads/2021/07/BTO1-1.jpeg360640adminhttps://itinzenjering.rs/wp-content/uploads/2021/04/it-inzenjering-logo.svgadmin2021-07-08 14:30:282021-07-15 07:45:19For public company “Elektroprivreda Srbije” (EPS) in mining basin „Kolubara“ revitalized conveyor drive station B=2000, V2 (4x1000kW) was put into operation
Completely new conveyor drive station B=1600, E2 was put into operation in MB “Kolubara“ on the open pit mine “Tamnava East” in April 2021. “IT Inženjering” in partnership with “Siemens” Beograd as a subcontractor of company “Energotehnika Južna Bačka” Novi Sad realized next activities: detailed design, documentation for construction, supply and assembling of electrical equipment, […]
https://itinzenjering.rs/wp-content/uploads/2021/05/B1600_E2_vest.jpg8231097adminhttps://itinzenjering.rs/wp-content/uploads/2021/04/it-inzenjering-logo.svgadmin2021-04-15 07:06:312021-07-15 07:40:10For public company “Elektroprivreda Srbije” (EPS) in mining basin „Kolubara“ new conveyor drive station B=1600, E2 (4x400kW) was put into operation
In January 2021, completely new mobile shift station MRS1800 was put into operation, in MB “Kolubara” on the open pit mine “Tamnava East”. The time availability test was successfully performed with an achieved availability of 99.1%, without a single failure of electrical equipment. “IT Inženjering“ Beograd, as a subcontractor of company “Energotehnika – Južna Bačka” […]
https://itinzenjering.rs/wp-content/uploads/2021/01/MRS1800.jpg10001333adminhttps://itinzenjering.rs/wp-content/uploads/2021/04/it-inzenjering-logo.svgadmin2021-01-06 10:52:252021-05-24 14:54:54Completely new mobile shift station MRS1800 was put into operation in MB Kolubara
IT Engineering Belgrade completed the business year 2020 with a positive financial result and achieved total revenue of 307 million RSD (2.6 million EUR), thus continuing the trend of growth in total revenue and successful business in previous years.
https://itinzenjering.rs/wp-content/uploads/2020/12/IT_Prihod_07_20_eng.jpg6221437adminhttps://itinzenjering.rs/wp-content/uploads/2021/04/it-inzenjering-logo.svgadmin2020-12-30 10:45:012021-05-24 14:54:51A good financial result achieved in the year 2020
Completely new conveyor drive station B=1600, E1 was put into operation in MB “Kolubara“ on the open pit mine “Tamnava West” in December 2020. “IT Inženjering” in partnership with “Siemens” Beograd as a subcontractor of company “Energotehnika Južna Bačka” Novi Sad realized next activities: detailed design, documentation for construction, supply and assembling of electrical equipment, […]
https://itinzenjering.rs/wp-content/uploads/2020/12/B1600_E1.jpeg10001333adminhttps://itinzenjering.rs/wp-content/uploads/2021/04/it-inzenjering-logo.svgadmin2020-12-19 10:55:012021-07-15 07:41:07For public company “Elektroprivreda Srbije” (EPS) in mining basin „Kolubara“ new conveyor drive station B=1600, E1 (4x400kW) was put into operation
https://itinzenjering.rs/wp-content/uploads/2021/04/Partner_2020_1-scaled.jpg25601815adminhttps://itinzenjering.rs/wp-content/uploads/2021/04/it-inzenjering-logo.svgadmin2020-10-28 09:56:102021-05-24 14:49:13The company SIEMENS Belgrade, LDA Minerals has declared IT ENGINEERING Belgrade as “Platinum partner” in year 2020
In October 2020, on MB “Tamnava West“, reconstruction of control system of four belt conveyors of the first BTO system was completed. “IT Inženjering” Beograd, in the consortium with company “Energotehnika – Južna Bačka” Novi Sad realized the complete project of reconstruction of electrical equipment.
https://itinzenjering.rs/wp-content/uploads/2021/04/BTO1_1.jpg10001778adminhttps://itinzenjering.rs/wp-content/uploads/2021/04/it-inzenjering-logo.svgadmin2020-10-27 10:48:332021-05-24 14:49:13Revitalization of BTO_1 system on MB „Tamnava West“
Over the period of September 2019 to February 2020, “IT Inženjering” Beograd as a subcontractor of the company “ABB Automation Gmbh” Beograd provided technical support in testing and commissioning of the “CQMS” coal quality control system in MB „Kolubara“. “IT Inženjering” Beograd participated in the correction of software for monitoring the quality of coal, as […]
For public company “Elektroprivreda Srbije” (EPS) in mining basin „Kolubara“ new conveyor drive station B=1600, E3 (4x400kW) was put into operation
Completely new conveyor drive station B=1600, E3 was put into operation in MB “Kolubara“ on the open pit mine “Field G” in June 2021. The time availability test (14×24 hour of continuous work) was successfully performed with an achieved availability of 99.95%, without a single failure of electrical equipment. “IT Inženjering” in partnership with “Siemens” […]
For public company “Elektroprivreda Srbije” (EPS) in mining basin „Kolubara“ revitalized conveyor drive station B=2000, V2 (4x1000kW) was put into operation
Revitalization of belt conveyor drive station with new frequency converters (SINAMICS S120 4x1000kW) was finished in MB “Kolubara” in June This drive station is a part of the ECS-1 (Excavator – Conveyor – Spreader) system 1 in open pit mine „Tamnava West“ “IT Inženjering” Beograd as a subcontractor of “Siemens” Beograd realized next activities: documentation […]
For public company “Elektroprivreda Srbije” (EPS) in mining basin „Kolubara“ new conveyor drive station B=1600, E2 (4x400kW) was put into operation
Completely new conveyor drive station B=1600, E2 was put into operation in MB “Kolubara“ on the open pit mine “Tamnava East” in April 2021. “IT Inženjering” in partnership with “Siemens” Beograd as a subcontractor of company “Energotehnika Južna Bačka” Novi Sad realized next activities: detailed design, documentation for construction, supply and assembling of electrical equipment, […]
Completely new mobile shift station MRS1800 was put into operation in MB Kolubara
In January 2021, completely new mobile shift station MRS1800 was put into operation, in MB “Kolubara” on the open pit mine “Tamnava East”. The time availability test was successfully performed with an achieved availability of 99.1%, without a single failure of electrical equipment. “IT Inženjering“ Beograd, as a subcontractor of company “Energotehnika – Južna Bačka” […]
A good financial result achieved in the year 2020
IT Engineering Belgrade completed the business year 2020 with a positive financial result and achieved total revenue of 307 million RSD (2.6 million EUR), thus continuing the trend of growth in total revenue and successful business in previous years.
For public company “Elektroprivreda Srbije” (EPS) in mining basin „Kolubara“ new conveyor drive station B=1600, E1 (4x400kW) was put into operation
Completely new conveyor drive station B=1600, E1 was put into operation in MB “Kolubara“ on the open pit mine “Tamnava West” in December 2020. “IT Inženjering” in partnership with “Siemens” Beograd as a subcontractor of company “Energotehnika Južna Bačka” Novi Sad realized next activities: detailed design, documentation for construction, supply and assembling of electrical equipment, […]
The company SIEMENS Belgrade, LDA Minerals has declared IT ENGINEERING Belgrade as “Platinum partner” in year 2020
The company SIEMENS Belgrade, LDA Minerals has declared IT ENGINEERING Belgrade as “Platinum partner” in year 2020
Revitalization of BTO_1 system on MB „Tamnava West“
In October 2020, on MB “Tamnava West“, reconstruction of control system of four belt conveyors of the first BTO system was completed. “IT Inženjering” Beograd, in the consortium with company “Energotehnika – Južna Bačka” Novi Sad realized the complete project of reconstruction of electrical equipment.
CQMS (Coal Quality Management System)
Over the period of September 2019 to February 2020, “IT Inženjering” Beograd as a subcontractor of the company “ABB Automation Gmbh” Beograd provided technical support in testing and commissioning of the “CQMS” coal quality control system in MB „Kolubara“. “IT Inženjering” Beograd participated in the correction of software for monitoring the quality of coal, as […]