IT Engineering Belgrade completed the business year 2017 with a positive financial result and achieved total revenue of 268,000,000RSD (over 2.2 million EUR), thus continuing the trend of growth in total revenue and successful business in previous years.
https://itinzenjering.rs/wp-content/uploads/2021/03/it-inzenjering-logo.png238400adminhttps://itinzenjering.rs/wp-content/uploads/2021/04/it-inzenjering-logo.svgadmin2018-01-01 09:35:142021-05-24 14:49:15A good financial result achieved in the year 2017
29/12/2017 – In GOŠA FOM AD, Smederevska Palanka equipment for Car for loading coal MUZ 32.3 was delivered. „IT ENGINEERING“ Belgrade realized the complete equipment integration.
https://itinzenjering.rs/wp-content/uploads/2021/04/Gosa2_2-1200x1600-1.jpg16001200adminhttps://itinzenjering.rs/wp-content/uploads/2021/04/it-inzenjering-logo.svgadmin2017-12-29 09:34:322021-05-24 14:54:59Equipment integration for Coal loading car
The company SIEMENS Belgrade, Division of digital factories, process industry and drives (DF PD) has declared IT ENGINEERING Belgrade as “Partner of the year with the highest growth in 2017” at the regular annual meeting of partners of this divisions held on December 22nd, 2017 in Belgrade . Representatives of more than 15 partners of the […]
https://itinzenjering.rs/wp-content/uploads/2021/04/DSC_0433.jpg16001066adminhttps://itinzenjering.rs/wp-content/uploads/2021/04/it-inzenjering-logo.svgadmin2017-12-22 09:33:542021-05-24 14:49:15The company SIEMENS Belgrade, Division of digital factories, process industry and drives (DF PD) has declared IT ENGINEERING Belgrade as “Partner of the year with the highest growth in 2017”
In MB „KOLUBARA“ on the open pit „Tamnava West Field“ reconstructed bucket wheel excavator SRs2000.32/5.0(2x670kW)+VR90±10 has started trial operation. „IT ENGINEERING“ Belgrade as a subcontractor of the company „SIEMENS“ Belgrade realized a significant part of the work on replacing the excavators control system.
During November 2017. at Military Medical Academy, Belgrade frequency converter manufactured by Danfoss was replaced. Control system for the exhaust air chamber of the Clinic for hematology was repaired. Frequency converter, manufactured by ABB, was replaced and control system for the air-conditioning chamber S-11 of the Clinic for emergency and internal medicine was repaired. Also, […]
https://itinzenjering.rs/wp-content/uploads/2021/04/309_17_VMA.png820570adminhttps://itinzenjering.rs/wp-content/uploads/2021/04/it-inzenjering-logo.svgadmin2017-11-20 09:24:472021-04-20 11:41:46Delivery, Installation and Commissioning of Frequency Converters at Military Medical Academy, Belgrade
29/06/2017 – In MB „KOLUBARA“ on the open pit „Tamnava West Field“ reconstructed belt conveyor B1600 – U1 (nominal power 4x400kW) has started trial operation. The machine was flooded in May 2014. “IT ENGINEERING“ Belgrade in the consortium with company „MONTPROJEKT“ Belgrade realized the complete project of reconstruction of electrical equipment.
https://itinzenjering.rs/wp-content/uploads/2021/04/Pogonska_stanica_B_1600_U1-1.jpg8651281adminhttps://itinzenjering.rs/wp-content/uploads/2021/04/it-inzenjering-logo.svgadmin2017-06-29 12:01:302021-05-24 14:54:44In MB „Kolubara“ reconstructed belt conveyor U1 (4x400kW) has started trial operation
03/03/2017 – In MB „KOLUBARA“ on the open pit mine „Field C“ equipment for conveyor drive station B2000 (3 sets) was delivered. „IT ENGINEERING“ Belgrade as a subcontractor of the company „SIEMENS“ Belgrade realized the complete equipment integration.
https://itinzenjering.rs/wp-content/uploads/2021/04/DSC_0361-1200x1800-1.jpg18001200adminhttps://itinzenjering.rs/wp-content/uploads/2021/04/it-inzenjering-logo.svgadmin2017-03-03 11:32:162021-04-20 11:33:08Equipment integration for conveyor drive station B2000
Reconstruction of bucket wheel excavator is in progress in MB „KOLUBARA“ on the open pit „Tamnava West Field“. „IT ENGINEERING“ Belgrade as a subcontractor of the company „SIEMENS“ Belgrade replaces the excavator’s control system.
A good financial result achieved in the year 2017
IT Engineering Belgrade completed the business year 2017 with a positive financial result and achieved total revenue of 268,000,000RSD (over 2.2 million EUR), thus continuing the trend of growth in total revenue and successful business in previous years.
Equipment integration for Coal loading car
29/12/2017 – In GOŠA FOM AD, Smederevska Palanka equipment for Car for loading coal MUZ 32.3 was delivered. „IT ENGINEERING“ Belgrade realized the complete equipment integration.
The company SIEMENS Belgrade, Division of digital factories, process industry and drives (DF PD) has declared IT ENGINEERING Belgrade as “Partner of the year with the highest growth in 2017”
The company SIEMENS Belgrade, Division of digital factories, process industry and drives (DF PD) has declared IT ENGINEERING Belgrade as “Partner of the year with the highest growth in 2017” at the regular annual meeting of partners of this divisions held on December 22nd, 2017 in Belgrade . Representatives of more than 15 partners of the […]
In MB „Kolubara“ reconstructed bucket wheel excavator SRs2000.32/5.0(2x670kW)+VR90±10 has started trial operation
In MB „KOLUBARA“ on the open pit „Tamnava West Field“ reconstructed bucket wheel excavator SRs2000.32/5.0(2x670kW)+VR90±10 has started trial operation. „IT ENGINEERING“ Belgrade as a subcontractor of the company „SIEMENS“ Belgrade realized a significant part of the work on replacing the excavators control system.
Equipment integration for Semi-portable crane 46+10t
24/11/2017 –In GOŠA FOM AD, Smederevska Palanka equipment for Semi-portable crane46+10t was delivered. „IT ENGINEERING“ Belgrade realized the complete equipment integration.
Delivery, Installation and Commissioning of Frequency Converters at Military Medical Academy, Belgrade
During November 2017. at Military Medical Academy, Belgrade frequency converter manufactured by Danfoss was replaced. Control system for the exhaust air chamber of the Clinic for hematology was repaired. Frequency converter, manufactured by ABB, was replaced and control system for the air-conditioning chamber S-11 of the Clinic for emergency and internal medicine was repaired. Also, […]
In MB „Kolubara“ reconstructed belt conveyor U1 (4x400kW) has started trial operation
29/06/2017 – In MB „KOLUBARA“ on the open pit „Tamnava West Field“ reconstructed belt conveyor B1600 – U1 (nominal power 4x400kW) has started trial operation. The machine was flooded in May 2014. “IT ENGINEERING“ Belgrade in the consortium with company „MONTPROJEKT“ Belgrade realized the complete project of reconstruction of electrical equipment.
Equipment integration for conveyor drive station B2000
03/03/2017 – In MB „KOLUBARA“ on the open pit mine „Field C“ equipment for conveyor drive station B2000 (3 sets) was delivered. „IT ENGINEERING“ Belgrade as a subcontractor of the company „SIEMENS“ Belgrade realized the complete equipment integration.
Recontruction of bucket wheel excavator SRs2000.32/5.0+VR90±10 – G2
Reconstruction of bucket wheel excavator is in progress in MB „KOLUBARA“ on the open pit „Tamnava West Field“. „IT ENGINEERING“ Belgrade as a subcontractor of the company „SIEMENS“ Belgrade replaces the excavator’s control system.