On 18/12/2019 – reconstructed belt conveyor B1600 – SU7 (nominal power 4x400kW) was put into operation in MB “Kolubara“ on the open pit “Field G“.
On 18/12/2019 – reconstructed belt conveyor B1600 – SU7 (nominal power 4x400kW) was put into operation in MB “Kolubara“ on the open pit “Field G“.
Leave a Reply
Want to join the discussion?Feel free to contribute!