Delivery of annual needs for spare parts and electronic assemblies for frequency converters and PLC systems
Replacement of electric motors and installation of frequency converter at the water supply plant for the facility’s cooling system of the Military Medical Academy
Testing and commissioning of existing control system SIMATIC S7-300 for gutter supporters production line
Equipment for coal quality management system, existing software modification, testing and commissioning – Project CQMS Package C1
End user: EPS, Mining Basin “KOLUBARA
Delivery of electronic assemblies, frequency control equipment, modules and other elements of control systems
Equipment integration for a wastewater treatment plant A.D. „Neoplanta Industrija mesa“ Novi Sad
Design and manufacture of power supply and control system for air conditioning and ventilation of the Data Center
Installation of electrical equipment in distribution cabinets and completion of electrical cabins for “Coal loading car MUZ 32.3, type Z 21323”
Substitution of control system for Bucket Wheel Excavator SRs2000.32/5.0+VR90+/-10 – G2 – Takraf